Magnet ID :     Background
Directory : S:\magdata\LCLS-II\Phase Shifter\Background\Stretched Wire HXR\DATASET0002\Final Results\Stretched Wire
   
Date : 10-05-2018
Time : 12:46:52 - 13:56:20
Operator : VV
   
Project : LCLS-II
Device Type : Phase Shifter
Run Number : 1
Data Type :
Run Comment : background measurement
   
gap I1Y I2Y I1X I2X
-
-7.9 1.6 (5)
-2.6 0.4 (5)
11.9 2.0 (4)
1.7 0.4 (5)

integral gap -02.00;+00.00 -01.00;+00.00 +00.00;+00.00 +01.00;+00.00 +02.00;+00.00
I1Y -
-9.7 5.7 (3)
2.9 1.4 (3)
-8.1 8.3 (3)
-0.7 7.5 (3)
-2.0 8.0 (3)
I2Y -
-2.3 1.2 (3)
0.1 0.6 (3)
-1.8 2.2 (3)
-0.1 0.4 (3)
-0.9 2.1 (3)
I1X -
12.2 1.4 (3)
11.1 0.6 (2)
11.5 0.8 (2)
11.3 0.5 (3)
11.8 0.4 (2)
I2X -
1.7 1.3 (3)
1.5 0.6 (3)
1.7 1.3 (3)
1.6 0.6 (3)
1.1 0.3 (3)

integral gap +00.00;-02.00 +00.00;-01.00 +00.00;+00.00 +00.00;+01.00 +00.00;+02.00
I1Y -
-11.0 0.5 (2)
-11.6 1.1 (3)
-11.4 1.1 (2)
-10.4 1.8 (3)
-11.2 1.3 (2)
I2Y -
-2.3 0.3 (3)
-2.7 0.2 (3)
-2.4 0.3 (3)
-2.7 0.2 (3)
-2.7 0.2 (3)
I1X -
10.6 1.5 (3)
10.7 4.7 (3)
9.9 2.5 (3)
12.7 3.9 (3)
11.1 4.5 (3)
I2X -
2.0 0.5 (3)
0.6 1.1 (3)
1.6 0.4 (3)
0.8 1.3 (3)
1.4 0.1 (3)

   
Magnet ID :     Background
Directory : S:\magdata\LCLS-II\Phase Shifter\Background\Stretched Wire HXR\DATASET0002\Final Results\Stretched Wire